Even though I'm not final drilling anything, I went ahead and followed the instructions to assemble everything as if I were going to drill it. At the very least it is a good check for fit and to give an idea of how everything goes together before I have a rivet gun in my hand. Everything went together well and no alignment problems. I spot checked several holes with a -4 rivet to confirm final size and all locations were good.
Then took everything apart and prepped the remaining ribs and skins for priming. Got through all of that, but it was a lot. Glad I broke it into sessions. Just the spars, caps and stringers left to prime and I'll have to wait till I get my new spar cap.
I'll have a lot of dimpling and some assembly to keep me occupied this week.